Proof for every part. Created on the line.
Today the OEM pulls. Tomorrow regulation does.
3STAC creates quality and identity data per unit right at the machine, the workstation and the end of line — and makes it reportable: today for OEM audits and claims, tomorrow for the Digital Product Passport. ERP, MES and CAQ stay as they are.

Not a prototype. In production.
Hardware, software and cloud running in series production today at automotive OEMs and Tier-1 suppliers. We know manufacturing pain points first-hand — not from a market report, but from the shop floor.
Leading German OEM
3D portal · end-of-line inspection · several plants. Recommends 3STAC to its supplier base.
Worldwide Tier-1 component supplier
3D portal + DPII platform · three plants on three continents.
International Tier-1 systems supplier
Full 3STAC stack · plants in Central and Eastern Europe · annually recurring contract.
Tier-1 plastics supplier
3D portal + web portal · two plants in Germany and Mexico.
Further Tier-1/2 customers in automotive and industry under NDA. Member of Catena-X. Reference calls on request.
The data your OEM demands is never created on the line.
OEMs demand structured quality data per unit today — in current contracts, ahead of any regulatory deadline. Tomorrow regulation will require the Digital Product Passport. ERP is not a DPP. MES is not a DPP.
The data is never generated
Parts are checked by sampling, not one by one. Production systems track batches — not individual units.
Fragmented across ERP, CAQ and Excel
Machine, material and test result never meet. Without linkage there is no data management.
Cannot be reported or proven
Audit evidence is produced by hand. Claims are paid instead of rebutted, because nobody can prove which parts are affected.
No per-unit proof → a sorting action at the OEM: around €130,000 (own estimate, 10 days). A recall without traceability quickly reaches the hundreds of millions. And no AI can learn from samples and paper.
Three steps. One stack.
Others assume the data exists. We create it — with our own hardware, right on the shop floor. We do not replace your infrastructure, we add to it.
Generate
Data per part right on the line — at the machine, the workstation and end of line, with our own hardware.
Manage
Linked through the serial number: machine, material, operator and test result in one place.
Report
Today for quality, traceability and OEM audits — tomorrow for the Digital Product Passport.

3STAC Connector
Machine & enterprise data integration

Operator Handheld
Guided validation at the workstation

3D Inspection Portal
End-of-line quality — automatic or manual

DPII Identity Stack
Identity created at source

DPII Cloud + AI
Manage, analyse, report
One platform. Three perspectives.
- Sampling lets defects reach the customer
- Claims are paid instead of rebutted
- IATF 16949 / VDA 6.3 audit evidence is assembled by hand
- 8D analyses take days because measurements are missing
- 100% inspection where required — about 60 seconds per part
- Proof per serial number: rebut claims instead of paying them
- Audit evidence at the push of a button, not reconstructed afterwards
- Trend analysis shows the drift while parts are still good
- Sorting actions at the OEM and entire batches blocked
- Rework and manual inspection hours tie up staff
- Machine data exists — but nobody stores or links it
- The OEM raises the data pressure, the IT project takes months
- Isolate the affected units instead of blocking the batch
- Retrofit without PLC reprogramming — installed in weeks
- Scale line by line without replacing existing systems
- The data is yours — in open formats, in the cloud or on site
- The OEM demands per-unit data and Catena-X capability in the new project
- An MES/SAP integration takes 6–18 months — SOP will not wait
- Traceability must be in the control plan and PPAP before the line runs
- No dedicated budget for a digitalisation project
- Enter before nomination: 3STAC as part of your quote to the OEM
- Funded from the project budget, not a separate IT budget
- Commissioning in weeks, with standard connectors
- Typically 8–16 weeks from first contact to order
Does it pay back in under 12 months?
That is our customers' buying question. 3STAC is installed in a few weeks, not months — which is why first contact to order typically takes 8–16 weeks.
No AI without data per part.
Everyone talks about AI in the factory. But AI needs data — and that is exactly what the plant lacks. 3STAC creates it. AI is not an add-on, it is built into the products: rule-based evaluation and trend analysis today, and in pilot an AI assistant that answers your questions right in the measurement view.
AI at 3STAC →
Test 3STAC at your own workstation.
Live demo
We show the stack at your site — with your parts.
Demo set on site
Handheld, connector and cloud with AI assistant stay 5–10 working days at a real workstation.
Report from your data
At pick-up: an evaluation of your own data and a concrete pilot offer.
Pilot → rollout
Paid pilot on one line, then line by line, plant by plant.

Automotive first. The same architecture for industry.
Automotive has the highest regulatory density and the strictest traceability requirements — that is where we are deployed. Batteries, electronics, textiles, furniture, cosmetics and pharma follow with their own drivers. Same stack, same serial-number logic.
View industries →Ready for the next audit round?
Talk to us about your line. We bring the demo set to you — without touching your controls.